This document contains the agreed version of the ISEAL Code (v1.0). Following recommendation for by the ISEAL Technical Committee, this was approved by the ISEAL Board on 29 November 2023. When reviewed alongside the summary of feedback received during the consultation period, it demonstrates the result of how input during the consultation has been taken into account. The ISEAL Code is effective from 1 March 2024, with an 18-month transition period for ISEAL Code Compliant organisations to meet the requirements in the ISEAL Code. For more information, read about the compliance approach and transition period.
The ISEAL Code is available in PDF and Excel format below. Read more about the ISEAL Code here.
The ISEAL Code - PDF7.8 MB
The ISEAL Code - Excel59.27 KB